Switching-device assembly workshop at Liqiang

Manufacturing
& quality.

Inside Liqiang’s switching-device workshop: assembly, adjustment, inspection and the documents that support equipment selection.

Switching-device assembly workshop at Liqiang.

Circuit breaker assemblies positioned along the production line
Circuit breaker assemblies along the production line.

Switching-device assembly.

Liqiang manufactures vacuum circuit breakers, load break switches, disconnectors and earthing switches. The construction and operating duty determine the assembly and inspection work for each device.

  1. Incoming components

    Mechanisms, vacuum interrupters, insulation, conductive parts and machined components are checked against their identification, drawings and applicable inspection requirements.

  2. Mechanism and primary-circuit assembly

    Springs, linkages and operating elements are assembled with the pole structure, insulating supports and conductive connections for the selected construction.

  3. Adjustment and operation

    Contact travel, mechanical movement and the operating sequence are adjusted against the model requirements. Manual and electrical functions are checked as applicable.

  4. Finished-device inspection

    The assembled structure, primary and secondary circuits, operating functions, markings and selected configuration determine the checks for the finished equipment.

Fabrication equipment: historical workshop photographs

These October 2020 photographs show a fiber-laser cutting machine in the workshop. They document the equipment at that time; current fabrication requirements should be confirmed for the project.

Fiber-laser cutting machine photographed in the workshop in 2020.
Fiber-laser cutting machine, photographed in October 2020.
Second view of the fiber-laser cutting machine in the workshop in 2020.
Second view of the same machine, October 2020.

Inspection activities and equipment.

Checks cover the assembled device and its operating interfaces. Mechanical characteristics, main-circuit resistance, insulation and control functions are selected according to the model and its technical requirements.

Control station and enclosed test area for power-frequency withstand-voltage and partial-discharge measurements.
Power-frequency & partial-discharge equipment

The control station and enclosed test area support the corresponding electrical measurements. The instrument range and procedure determine the applicable measurement scope.

Portable instrument-transformer voltage-current characteristic tester.
Instrument-transformer characteristics

A portable tester is used for voltage-current characteristic measurements. The required transformer and test points determine the setup.

Three-phase high-current equipment used with a temperature-rise test setup.
Current-output equipment

High-current equipment forms part of a temperature-rise test setup. Current-output calibration and temperature measurement are separate parts of the measurement chain.

Test cabinets for 10 kV primary and secondary integrated equipment.
Primary & secondary integration

Dedicated test cabinets support checks of primary and secondary integrated equipment. Product and controller configuration determine the applicable functions.

View another photograph of the electrical test equipment
Power-frequency test unit and test-area equipment.
A further view of the power-frequency and partial-discharge test equipment.
Instrument calibration records
Calibration dates and measurement items
InstrumentRecord / calibration dateScope
GYPD-20/150DN260049130016
28 February 2026
Specified metrology items in the power-frequency / partial-discharge equipment record; accreditation coverage is item-specific.
HZ8006DN260049130019
28 February 2026
Listed voltage and current measurement points; the current results extend to 20 A.
HZJC-2500ADN260049130001
28 February 2026
Current-output calibration. Temperature channels and product temperature-rise results require their own records.
KE980626KY019605001
3 January 2026
Specified measurement items for the integrated-equipment test system.

Instrument calibration supports the stated measurements. Product test reports address a named sample and test scope. For a project, confirm both the equipment configuration and the records needed for acceptance.

Packing and accompanying documents.

Product condition, nameplate, configuration and matched accessories are checked together before packing. The document set follows the selected equipment and project requirements.

Switching equipment wrapped in plastic on a pallet with timber supports
Wrapped equipment on a timber-framed pallet.
Switching units wrapped in clear film and stacked on a wooden pallet
Individually wrapped switching units.
Labelled wooden packing cases beside wrapped switching equipment
Labelled wooden cases in the packing area.
Packaged equipment beside an aisle in the Liqiang production workshop
Packaged equipment in the workshop.
Load break switch positioned inside an open wooden packing case
Load break switch inside a wooden case.
Controller and connecting cables packed together in a carton
Controller and matched connecting cables.
Factory inspection information
Records for the unit or batch and the checks applicable to its selected construction. Confirm the required format and acceptance items for the order.
Model-specific test reports
Reports identify a tested sample, configuration, date and test scope. Use the relevant product page to review the available report description and request the documents needed for the project.
Manuals, drawings and accessories
Operating instructions, outline and control information, together with the handles, connectors, cables or other accessories applicable to the selected equipment.

Assembly process documents.

The VS1-12/1250-31.5 process documents set out assembly operations and inspection requirements. The dated examples below apply to this configuration.

April 2021 production-flow document for VS1-12/1250-31.5.
VS1-12/1250-31.5 process-flow document, April 2021.
VS1-12 operation-counter assembly instructions showing mounting orientation, fastener tightening and inspection checks.
Assembly and inspection requirements from the VS1-12 process-card set.
View a further assembly and inspection example
VS1-12 support-bracket bore deburring and polishing instructions showing tools, working method and inspection checks.
Further assembly and inspection requirements from the VS1-12 process-card set.

Process cards define what is required at an operation. Completed inspection records serve a separate purpose: recording the checks for the actual unit or batch. For VS1-12 selection, use the model documents alongside the required ratings and construction.

Management systems and records.

The certificates below identify Zhejiang Liqiang Intelligent Equipment Co., Ltd., their stated scope and printed dates. Open the original certificate image and the matching surveillance attachment where provided.

ISO 9001:2015

Quality management
Production of high-voltage switches and high-voltage vacuum circuit breakers.

Printed validity: 2 June 2024–1 June 2027.

View certificate and surveillance attachment
ISO 9001:2015 quality-management certificate issued to Zhejiang Liqiang Intelligent Equipment.
ISO 9001:2015 certificate.
2026 surveillance-review attachment to the ISO 9001 certificate.
Surveillance review: 23 May 2026. Confirmation: 28 May 2026.

ISO 14001:2015

Environmental management
Production of high-voltage switches and high-voltage vacuum circuit breakers.

Printed validity: 2 June 2024–1 June 2027.

View certificate and surveillance attachment
ISO 14001:2015 environmental-management certificate issued to Zhejiang Liqiang Intelligent Equipment.
ISO 14001:2015 certificate.
2026 surveillance-review attachment to the ISO 14001 management-system certificate.
Surveillance review: 23 May 2026. Confirmation: 28 May 2026.

ISO 45001:2018

Occupational health and safety
Production of high-voltage switches and high-voltage vacuum circuit breakers.

Printed validity: 2 June 2024–1 June 2027.

View certificate and surveillance attachment
ISO 45001:2018 occupational health and safety management certificate issued to Zhejiang Liqiang Intelligent Equipment.
ISO 45001:2018 certificate.
2026 surveillance-review attachment to the ISO 45001 management-system certificate.
Surveillance review: 23 May 2026. Confirmation: 28 May 2026.

ISO 50001:2018

Energy management
Energy management for the stated assembly, inspection, auxiliary and office processes.

Printed validity: 6 June 2025–5 June 2028.

View certificate
ISO 50001:2018 energy-management certificate issued to Zhejiang Liqiang Intelligent Equipment.
ISO 50001:2018 certificate.

Management-system certification concerns the stated organizational processes. For product compliance, review the exact model, construction and applicable test documentation separately.

Additional manufacturing-management evaluations

These supporting records are third-party management-system certifications. Their names refer to the issuing body’s assessment scheme.

Third-party Future Factory management-system certificate issued to Zhejiang Liqiang Intelligent Equipment.
Future Factory management-system certificate

Issued by Zhongzheng Excellent Certification Group Co., Ltd. under CTS ZZEC1015-2025. Printed term: 7 July 2025–6 July 2028.

View full record
English-page third-party Intelligent Manufacturing Demonstration Factory management-system certificate.
Intelligent Manufacturing Demonstration Factory Management System Certification

Issued by Zhongzheng Excellent Certification Group Co., Ltd. under CTS ZZEC1024-2025. Printed term: 16 July 2025–15 July 2028.

View full record
Third-party Digital Workshop certificate issued to Zhejiang Liqiang Intelligent Equipment.
Digital Workshop certificate

Issued by Zhongzheng Excellent Certification Group Co., Ltd. under CTS ZZEC1017-2025. Printed term: 7 July 2025–6 July 2028.

View full record
Third-party Digital Leadership Enterprise certificate issued to Zhejiang Liqiang Intelligent Equipment.
Digital Leadership Enterprise certification

Issued by Zhongzheng Excellent Certification Group Co., Ltd. under CTS ZZEC1014-2025. Printed term: 7 July 2025–6 July 2028.

View full record

Environment & energy records.

Environmental, energy and supply-chain records support supplier review. The scope and period of each record determine how it applies to a procurement requirement.

Supply-chain and environmental management evaluations
Bilingual Green Supply Chain management-system certificate issued to Zhejiang Liqiang Intelligent Equipment.
Green Supply Chain management-system certificate

Issued by ZhongQiu United International Certification (Beijing) Co., Ltd. against GB/T 33635-2017 and GB/T 39257-2020. Printed term: 6 June 2025–5 June 2028.

View full record
Bilingual Green Design Product evaluation-system certificate issued to Zhejiang Liqiang Intelligent Equipment.
Green Design Product evaluation-system certificate

Issued by ZhongQiu United International Certification (Beijing) Co., Ltd. against CTS-ZQA-SC-0017:2023. Printed term: 6 June 2025–5 June 2028.

View full record
Bilingual Green Enterprise management-system certificate issued to Zhejiang Liqiang Intelligent Equipment.
Green Enterprise management-system certificate

Issued by ZhongQiu United International Certification (Beijing) Co., Ltd. against DB4403/T 146:2021 and CTS ZQA 19988:2023. Printed term: 6 June 2025–5 June 2028.

View full record
Green electricity certificate transaction — 2025

The record dated 12 May 2025 documents the purchase of 50 green electricity certificates corresponding to 50 MWh, with a generation period of November 2024. This is a dated transaction record; an annual renewable-electricity share requires the corresponding consumption and certificate-use records.

Green electricity certificate transaction record dated 12 May 2025 for 50 certificates corresponding to 50 MWh.
Green electricity certificate transaction record, 12 May 2025.